Operadroom

Pilot demo · CDU-1 · Crude Distillation · Pre-TA · OPEX containment

Maintenance Execution Agent · On Standby

Phase 0 data layer linked (tags, P&IDs, SAP, historian). Agent armed for Safe Isolation & Maintenance Execution on P-2047. Inject a critical event to run ESSA → AI: eliminate coordination noise, aggregate records, draft the SAP work order — one engineer releases.

Pilot scenario

Pre-TA · OPEX containment

Harbourside Energy & Chemicals Park

POC unit · process

CDU-1 · Crude Distillation

PILOT-01 · Safe Isolation & Maintenance Execution

Lead asset

P-2047

Crude Charge Pump

Coordination target

1 engineer + agent

vs 10–15 coordinating roles · 4–6 hours

Tag Master

ISA tags · equipment IDs

Synced

P&ID Graph

Node P-2047 resolved

Linked

Cognite CDF

Asset twin sync

Connected

PI Historian

1.2s cycle

Streaming

SAP PM / MM

HITL enforced

Ready

Reelin ID

Audit trail

Active

ESSA + AI

Eliminate · Simplify · Standardize · Aggregate · AI

PILOT-01 · Asset Management

Eliminate

Simplify

Standardize

Aggregate

AI

System state

Standby

Facility health

19/19 nominal

Target process

PILOT-01

Pipeline

Idle · data layer linked

Last scan

18:51:32

Digital twin · Monitoring 19 assets

Facility overview

Loading 3D twin…

Click tag in 3D or list to inspectAll assets streaming4 tags on focus asset

Facility telemetry matrix

All assets · simultaneous scan

19 streams
TagUnitPrimary tagValueStatus
P-2047CDU-1 · Crude DistillationVibration (DE)2.1 mm/s RMSFocus
P-1012VDU · Vacuum DistillationVibration (DE)1.8 mm/s RMSOK
C-3011FCC · Fluid Catalytic CrackingVibration (Axial)3.4 mm/s RMSOK
E-1156CDU-1 · Heat RecoveryTube Side ΔT42.4 °COK
V-4820CDU-1 · Distillation ControlValve Position62.1 %OK
T-1105Tank Farm · ReceiptShell Temperature37.8 °COK
PL-302CDU-1 · InterconnectWall Thickness12.5 mmOK
C-801CDU-1 · Primary FractionationTop Pressure1.4 barOK
F-2201CDU-1 · Fired EquipmentBridgewall Temp405.8 °COK
XV-3044FCC · Safety InstrumentedStroke Time2.8 sOK
P-2048CDU-1 · DesaltingVibration (DE)1.9 mm/s RMSOK
P-2049CDU-1 · Primary FractionationVibration (NDE)2.0 mm/s RMSOK
P-2050CDU-1 · Product RecoveryVibration (DE)1.7 mm/s RMSOK
P-2051CDU-1 · Stripping SectionVibration (DE)2.3 mm/s RMSOK
E-1157CDU-1 · DesaltingOutlet Temp89.1 °COK
E-1158CDU-1 · Heat RecoveryApproach Temp18.3 °COK
V-4821CDU-1 · Fired EquipmentValve Position58.8 %OK
V-4822CDU-1 · Distillation ControlValve Position43.3 %OK
A-1101CDU-1 · Quality MonitoringSulfur Deviation0.000 ppmOK

Control

Harbourside Refinery Complex

Focus asset: P-2047 · inject applies to selection only

01 · Telemetry

Focused asset · PI stream

NORM
Vibration (DE)2.1mm/s RMS
Bearing Temp (NDE)68.6°C
Discharge Pressure18.5bar
Flow Rate832.8m³/h

02 · Agent

Operadroom

POC armed · standby
Livemonitoring

POC armed — Safe Isolation & maintenance execution

Tags · P&IDs · PI · SAP linked · 19 assets · scan 0

03 · ERP

SAP PM

—

Standby — PILOT-01 · data layer linked · inject event to run pipeline